Ukraine forming multi-level protection for energy facilities – PM Shmyhal

Ukraine forming multi-level protection for energy facilities – PM Shmyhal

Ukrinform
In Ukraine, five nuclear power units have already been repaired, while four more are currently being repaired.

Prime Minister Denys Shmyhal said this in a post on Facebook, Ukrinform reports.

"We understand that there is a high probability that Russians will continue massive attacks on the power system. As to NPPs: five nuclear units have been repaired, four more are under repair. As to TPPs: 62% of the planned power units have been repaired. As to TPPs: 70% have been repaired. As to HPPs: 32 units have been repaired or under repair," Shmyhal wrote.

Read also: Energy security: Yermak meets with representatives of 58 countries to discuss Peace Formula implementation

He noted that Ukrenergo has already repaired almost 80% of the main networks, high-voltage substations have already been restored to the pre-war level.

"The repair campaign goes according to plan. We are forming multi-level protection for energy facilities," the Prime Minister added.

As reported, the Cabinet of Ministers is expanding the program of exchanging incandescent lamps for LED ones.

While citing and using any materials on the Internet, links to the website ukrinform.net not lower than the first paragraph are mandatory. In addition, citing the translated materials of foreign media outlets is possible only if there is a link to the website ukrinform.net and the website of a foreign media outlet. Materials marked as "Advertisement" or with a disclaimer reading "The material has been posted in accordance with Part 3 of Article 9 of the Law of Ukraine "On Advertising" No. 270/96-VR of July 3, 1996 and the Law of Ukraine "On the Media" No. 2849-Х of March 31, 2023 and on the basis of an agreement/invoice.

© 2015-2024 Ukrinform. All rights reserved.

Website design Studio Laconica

Extended searchHide extended search
By period:
-