The fifth vessel loaded with 80 thousand t of gas coal for DTEK’s thermal power plants has arrived at TIS Port in Odesa Region from Colombia

Ukrinform
The fifth vessel loaded with 80 thousand t of gas coal for DTEK’s thermal power plants has arrived at TIS Port in Odesa Region from Colombia

Top news

While citing and using any materials on the Internet, links to the website ukrinform.net not lower than the first paragraph are mandatory. In addition, citing the translated materials of foreign media outlets is possible only if there is a link to the website ukrinform.net and the website of a foreign media outlet. Materials marked as "Advertisement" or with a disclaimer reading "The material has been posted in accordance with Part 3 of Article 9 of the Law of Ukraine "On Advertising" No. 270/96-VR of July 3, 1996 and the Law of Ukraine "On the Media" No. 2849-Х of March 31, 2023 and on the basis of an agreement/invoice.

© 2015-2024 Ukrinform. All rights reserved.

Website design Studio Laconica

Extended searchHide extended search
By period:
-