Critical infrastructure of Kherson region equipped with powerful generators – Administration

Critical infrastructure of Kherson region equipped with powerful generators – Administration

Ukrinform
All critical infrastructure enterprises in the de-occupied territory of Kherson region are equipped with powerful generators in case of blackout.

"Regarding critical infrastructure facilities, we already have experience of working in these conditions last year, in conditions of large-scale blackouts not only in Kherson region but also throughout the country. We are preparing for blackouts," Oleksandr Prokudin, Head of the Kherson Regional Military Administration, said at a press conference, Ukrinform reports.

Prokudin emphasized that each enterprise of critical infrastructure is equipped with large generators in case of emergency connection.

According to him, there are currently about a hundred such generators at enterprises. In case of a long-term blackout, the governor noted, these generators will not be able to work in such a mode, however, as practice has shown, three to seven days are enough to restore the power supply after hits.

Photo: Ministry of Energy

While citing and using any materials on the Internet, links to the website ukrinform.net not lower than the first paragraph are mandatory. In addition, citing the translated materials of foreign media outlets is possible only if there is a link to the website ukrinform.net and the website of a foreign media outlet. Materials marked as "Advertisement" or with a disclaimer reading "The material has been posted in accordance with Part 3 of Article 9 of the Law of Ukraine "On Advertising" No. 270/96-VR of July 3, 1996 and the Law of Ukraine "On the Media" No. 2849-Х of March 31, 2023 and on the basis of an agreement/invoice.

© 2015-2024 Ukrinform. All rights reserved.

Website design Studio Laconica

Extended searchHide extended search
By period:
-